.
|
Master
plan development is in its 4th year and may lead to
a public referendum on plan projects as well as
on key parts of the district's five-year maintenance plan. This web site will keep you
up-to-date on referendum propositions, background information, meeting
dates, and much more.
|
INDEX
The district began its current master plan development in the fall of
2003.
NEWS
- DECEMBER 10, 2007, 7 PM,
WJHS AUDITORIUM
- TRANSITIONAL SPACE
I. Follow-up to Questions from November 19, 2007 Special Transitional
Space Meeting
A. Possible Offsite Locations – T. Stella (15
minutes)
B. State Education Department Requirements for
Administrative Oversight at Offsite Locations – C. Thomas (5 minutes)
C. Fishkill Elementary School Building Use
& Enrollments Past vs. Present – C. Thomas (15 minutes)
II. Re-visit November 19, 2007 Transitional Space Committee
Recommendations – C. Thomas (15 minutes)
A. Fishkill Elementary School
B. Myers Corners Elementary School
C. Kinry Road Elementary School
III. Specific Solution Recommendations – C. Thomas (15 minutes)
A. Fishkill Elementary School (Use of Temporary vs.
Permanent Modular Classrooms)
B. Myers Corners Elementary School
C. Kinry Road Elementary School
IV. Solutions “Logistics” – M. Moloney (15 minutes)
A. Costs
B. Funding Options
C. Timelines
D. Necessary Board Resolutions
- MASTER PLAN
I. Re-statement of Master Plan Goals – R. Powell (5 minutes)
II. High School Common Space Planning & Costs Update - N.
Waer (15 minutes)
III. Use of Modular Construction – N. Waer/L. Rodriguez (15 minutes)
IV. Review of Five-Year Plan Projects – T. Rosato (15 minutes) A.
Priorities 1, 2 and 3 B. Priorities 1, 2 and 3 Included in Middle
School Renovations
V. Review of Possible Referendum Propositions – R. Powell (10 minutes)
VI. Discussion & Questions - All
- November 19, 2007
1. Transitional Space Plan [pdf] - C. Thomas
2. Master Plan Agenda
A. Re-statement of Master Plan
Goals [pdf] -
R. Powell
B. Update of Five-Year Plan
Projects - M. Moloney and L. Rodriguez
(1) Project Priorities 1, 2, and 3
[pdf]
(2)
Five-Year Plan Projects included in Proposed Middle School
Renovations/Additions [pdf]
C. Proposed Middle School
Renovations/Additions
(1) Cost
Analysis - L. Rodriguez
(2)
Review of Floorplans [VW pdf] [WJH pdf] - N.
Waer and J. Onderdonk
(3) Feasibility
of Modular Constructions - L. Rodriguez
D. Construction of New Elementary
School - R. Powell
E. Referendum Propositions - R.
Powell
F. Review of Referendum Procedural
Timeline - R. Powell.
G. What's Next?
- November 19, 2007
1. Transitional Space Plan [pdf] - C. Thomas
2. Master Plan Agenda
A. Re-statement of Master Plan
Goals [pdf] -
R. Powell
B. Update of Five-Year Plan
Projects - M. Moloney and L. Rodriguez
(1) Project Priorities 1, 2, and 3
[pdf]
(2)
Five-Year Plan Projects included in Proposed Middle School
Renovations/Additions [pdf]
C. Proposed Middle School
Renovations/Additions
(1) Cost
Analysis - L. Rodriguez
(2)
Review of Floorplans [VW pdf] [WJH pdf] - N.
Waer and J. Onderdonk
(3) Feasibility
of Modular Constructions - L. Rodriguez
D. Construction of New Elementary
School - R. Powell
E. Referendum Propositions - R.
Powell
F. Review of Referendum Procedural
Timeline - R. Powell.
G. What's Next?
- October 29, 2007
1. Master Plan
A. Review of the six master plan
goals - R. Powell
B. What has yet to be addressed -
R. Powell
C. Construction impact: building
an elementary school - N. Waer
2. Referendum Scenarios
A. Scenario 1: Renovation of two
junior high schools, construction of an elementary school,
implementaiton of 5-year plan, installation of turf fields - M. Moloney
(1) Construction costs
(2) Bonding
B. Scenario 2: Possible impact of
the abandonment of one or more master plan goals - C. Thomas
(1) No full-day kindergarten
(2) No class size guidelines
(3) Others (to be mentioned but
not explored at this time)
3. Next Steps
A. Discussion
- October 1, 2007:
The Board heard updated
presentations regarding
Master Plan Goals [click here for a
700k pdf version of the PowerPoint presentation made that evening]:
• Accommodating growing student enrollments
• Implementation of a Middle Level Model
• Implementation of consistent K-12 feeder patterns
• Establishment of consistent grade-level
configurations
• Establishment of reduced class size guidelines
• Establishment of Intervention Services at home
schools
• Updating and improving district facilities
• Consider the possibility of full day Kindergarten
- February 5, 2007
meeting, 8 PM - agenda [pdf]
- Final Environmental Impact Statement [January 2007], in
three parts
- Part
1 - Main body, Appendix A (September 18, 2006 public hearing
transcript), Appendix B (written comments) [671k pdf]
- Part
2 - Appendix C: Photos [1127k pdf]
- Part
3 - Appendix C: Elementary school site plan [391k pdf]
- Part
4: Appendix D (DC Health Department and Village of Wappingers Falls
letters) [210k pdf]
- Click here to see the
September draft environmental impact statement
GOALS
The master plan has encompassed six goals, described by the
superintendent at various times including at a public presentation on June 7, 2006
[pdf].
- Consistent K-12 feeder patterns (that is, a student
entering kindergarten will go to elementary school "A," middle school
"B," and high school "C" without having that pattern change during the
time he or or she is in school.
- Consistent grade level configurations (that is, elementary
schools will house grades K-5, middle schools will house grades 6-8,
and high schools will house grades 7-12).
- Full day kindergarten.
- Class size guidelines for grades K-2 and 3-5.
- Intervention services at home schools.
- A middle school model for grades 6-8
Two other goals, often mentioned but not included on the above list,
deal with
- Managing enrollment growth (particularly at the high
schools)
- Maintaining district facilities
RESOURCE
NEEDS
The district has worked on estimating plan costs. The files below
contain estimates, as of the dates shown.
|